write a project report for the intersection traffic and road conditions at the intersection of north harbor drive and harbor island drive in san diego california

This is traffic engineering design class. This is a project report for the intersection

(Traffic and Road Conditions at the intersection of North Harbor Drive and Harbor Island Drive in San Diego, California )

Your project should improve the mobility, bicyclists, and pedestrian for the intersection street. Your project document should be comprehensive to cover all relevant information. No maximum length, but no less than 10 pages not including graphs, tables and figures.

it may be better suited to follow the format outlined in the attached sample Project Report.

project report should include:

1) Needs Assessment

2) Data Analysis

3) List of Alternatives: current deficiencies and ways to correct them

4) Analysis of the preferred alternative: cost, impact and benefit

Data Needed:

Maps of the Area

-Affected streets surrounding the intersection

-Trips per day on each street

-Reasons leading to congestion.

-Cost analysis

-Land use data

There are 2 attachments:

attachment 1 : sample project report: follow this sample

attachment 2: scope of work and more details for the requirments

https://www.sandag.org/uploads/projectid/projectid…

The link above is related to the problem for the intersection. please see the link for more information and ideas as a references.

I will provide you the calculations for the mobility, bike, and pedestrian within 1 week after you start the report.

 
Do you need a similar assignment done for you from scratch? We have qualified writers to help you. We assure you an A+ quality paper that is free from plagiarism. Order now for an Amazing Discount!
Use Discount Code "Newclient" for a 15% Discount!

NB: We do not resell papers. Upon ordering, we do an original paper exclusively for you.